Describe the loss and your AI builds the estimate in Projul, landing in "Estimates" as a Draft ready to review and send.
The sections of a restoration estimate
Your AI creates the project if none exists, per How do I have my AI handle restoration leads and follow-ups? It holds one estimate, so your AI offers to edit it or add a change order instead.
A water loss runs emergency response, demolition, containment, drying, drywall, paint, flooring and cleanup as sections; fire swaps in board-up and soot removal; mold runs containment and clearance. Each line item has a type, quantity, unit, cost and markup; Projul totals it, per How does my AI calculate prices, markup and tax? Or copy a template, per How do I have my AI create an estimate from one of my templates?
What to say to your AI
Brief the job section by section, as you would an estimator. Copy the prompt below and change the bracketed parts.
Build an estimate in Projul for [Whitcomb Water Loss]. It is a [category 2 supply line failure on the second floor, affecting 640 sq ft across a hallway, bedroom and the ceiling below]. Emergency response and extraction: [after-hours call-out, 1 at $325] no markup, [tech labor, 6 hours at $65] plus [40]% markup, [extraction from carpet and pad, 480 sq ft at $0.65] plus [20]%. Demolition and disposal: [2 ft flood cut, 96 linear feet at $2.40] plus [20]%, [carpet and pad removal, 480 sq ft at $0.55] plus [20]%, [20-yard dumpster, 1 at $525] plus [15]%. Containment and air quality: [6 mil poly barrier, 320 sq ft at $1.10] plus [25]%, [zipper doors, 2 at $38] plus [25]%, [air scrubber, 8 unit days at $75] plus [20]%. Structural drying: [air mover, 48 unit days at $28] plus [20]%, [LGR dehumidifier, 12 unit days at $95] plus [20]%, [antimicrobial application, 640 sq ft at $0.38] plus [25]%, [monitoring visits, 4 at 1.5 hours, $65 per hour] plus [40]%. Insulation and drywall: [R-13 batt, 320 sq ft at $1.15] plus [20]%, [drywall hang and finish, 640 sq ft at $2.85] plus [25]%, [texture, 640 sq ft at $0.95] plus [25]%. Paint and trim: [prime and two coats, 640 sq ft at $1.35] plus [25]%, [baseboard, 96 linear feet at $4.20] plus [25]%. Flooring: [LVP with underlayment, 480 sq ft at $5.60] plus [25]%. Final cleaning and fees: [post-construction clean, $285] plus [20]%, [building permit, $180, no markup, not taxable]. Apply our [Ohio] sales tax and tell me the estimate number and the total.
Hidden damage is the change order every restoration contractor writes: the wall opens further, or a material tests positive. Your AI adds it as its own Draft, leaving the original untouched.
Add a change order to the [Whitcomb Water Loss] estimate in Projul called [Hidden damage, adjoining bedroom]: [2 ft flood cut, 44 linear feet at $2.40] plus [20]%, [carpet and pad removal, 180 sq ft at $0.55] plus [20]%, [antimicrobial, 180 sq ft at $0.38] plus [25]%, [drywall hang, finish and texture, 220 sq ft at $3.80] plus [25]%, [paint, 220 sq ft at $1.35] plus [25]%. Apply our [Ohio] tax.
For a fire loss or shorter brief: How do I have my AI build an estimate from scratch? and How do I have my AI add a change order?
Client choices and what you'll see
Reconstruction and contents are often the homeowner's choice: a selection can require one, allow one or none, or any number, per How do I use subsections, selections and display-only sections with my AI? Tax applies only when you name a rate; your AI also writes the intro and contract text, covering drying standard and deductible responsibility, per How do I have my AI write the introduction and contract text?
Your AI reports the estimate number and total. In Projul, the new Draft sits at the top of "Estimates".
Your AI edits the estimate as a Draft; publishing and sending happen in Projul, per Can my AI publish or send an estimate? It reuses your templates, per How do I build and reuse estimate, section and line-item templates with my AI? Invoices, payments and purchase orders are not yet available, per Which Projul features are not available to my AI yet? Next: How do I have my AI schedule restoration crews and jobs?