Projul AI Connect lets the AI assistant you already use work inside your Projul account. Turn it on from "Settings" by creating an API key under "Projul AI Connect". This article lists what a drywall and insulation contractor can have their AI do, with a link to the how-to for each.
Contents
Leads and clients
Your AI can add a client and a lead, set the job-site address and likelihood of sale, put it in a pipeline stage, assign the estimator, log a call, and schedule an estimate walkthrough.
Add a lead for [client name] at [job-site address], set the likelihood of sale to [percent], assign [estimator name], and schedule a walkthrough for [date and time].
See How do I have my AI handle drywall and insulation leads and follow-ups?.
Estimates and change orders
Your AI can build an estimate with sections such as insulation, hang, finish and texture, add priced line items marked as labor or material, apply a saved tax rate or discount, write the introduction and contract text, and copy a template instead of starting blank. It can also add a change order, for example added sheets. Estimates and change orders are created as Drafts for you to review and send.
Build an estimate for [project name] with sections for insulation, hang, finish and texture. Use [attic R-value] blown insulation, [wall type] batts, [square footage] of 5/8" board, and apply [tax rate name].
See How do I have my AI build a drywall and insulation estimate? and How do I have my AI add a change order?.
Scheduling crews
Your AI can create a task for each phase, such as insulate, hang, tape, and texture, with a start and end window, and put a multi-day window on a coat that spans several days. It can assign a person or a team, add a checklist, mark a task complete, set up a repeating task, and move a task's dates without changing the rest of the schedule.
Create the hang, tape, and texture tasks for [project name], each [number] days, assign [crew or team name], and move any task delayed by the board delivery on [date].
See How do I have my AI schedule drywall and insulation crews and jobs?.
Photos and files
Your AI can find photos and documents already in a project and attach them to a task or an estimate line, for example a moisture reading attached to its line item. Uploading a new file depends on the AI tool: some can only attach files already in Projul.
See How do I attach files to a task or an estimate with my AI?.
Messages and call logs
Your AI can log a call, text or site visit as a message on a project, client, task or estimate, including the contact method and outcome. It cannot send a message, email or text to a client.
See How do I have my AI log a call, text or site visit on a job?.
Templates
Your AI can build and reuse estimate, section and line item templates, such as a priced "Attic blow, R-38" section, so new estimates price from your own library.
See How do I build and reuse estimate, section and line item templates with my AI?.
What your AI cannot do yet
Your AI does not create, edit or send invoices, or touch payments, and creates estimates and change orders only as Drafts for a person to publish and send. It does not reach time tracking, purchase orders, daily logs, or the QuickBooks sync.
Note: The full list is kept in Which Projul features are not available to my AI yet?.
Where to start
- Create your API key. See How do I get my Projul AI Connect API key?.
- Choose the AI tool to connect. See the "Connect your AI" section.
- Confirm the connection works. See How do I check that my AI is connected to Projul?.
- Build one estimate. See How do I have my AI build a drywall and insulation estimate?.
- Add your next lead. See How do I have my AI handle drywall and insulation leads and follow-ups?.
- Lay out a job schedule. See How do I have my AI schedule drywall and insulation crews and jobs?.
- Keep the prompts you like. See Copy-paste prompts: drywall and insulation contractors.