Read your measure sheet to your AI and it builds the estimate in Projul: sections for tear-out, units, install labor and capping, each line priced with your cost and markup. It lands in "Estimates" as a Draft.
Before you start
Your AI needs a Read-Write key and a project or lead in Projul; ask it to create the lead first if there is none. See How do I have my AI handle window and door replacement leads and follow-ups?. A project holds one estimate, so an existing one gets a change order instead.
Telling it the job
Give it opening count, style, frame material, glass package, pocket or full-frame install, trim and capping footage, and your rates. Mention a template or saved cost-item you already have and it uses that instead.
Build an estimate in Projul for [Delgado Whole House Windows]: [13] openings of [white vinyl double-hung, Low-E with argon] and [1] [picture window], pocket install, plus one [6 ft vinyl patio slider]. Tear-out at [0.75] hours per opening at [$52] with [40]% markup, units at [$412] each with [30]% markup, install labor at [1.5] hours per opening at [$58] with [40]% markup, and [186] lin ft of [aluminum capping] at [$4.80] with [30]% markup. Apply our [Utah] tax.
What comes out
Your AI adds each section and line: kind, quantity, unit, cost, markup, and vendor and part number where tracked. Projul prices it like the editor and reports the estimate number and total. Click "Estimates" for the Draft; keep adjusting by talking or edit it in Projul. A frame-material or glass choice is a selection: exactly one, one or none, or any number. See How do I use subsections, selections and display-only sections with my AI?.
Tax, templates and change orders
Tax applies only when you name a rate from settings; mark a permit line not taxable. See How does my AI calculate prices, markup and tax?. Save a repeat job as a template for your AI to copy and adjust. See How do I build and reuse estimate, section and line-item templates with my AI? and How do I have my AI create an estimate from one of my templates?. Rot, tempered glass, added openings or a switch to full-frame become a change order, a Draft that leaves the approved estimate untouched; removed scope is a display-only deduction.
Add a change order to [Delgado Whole House Windows] in Projul called [Rotted sill and framing, kitchen opening]: [1] [sill and framing rebuild] at [$210] in material with [25]% markup and [4] hours of carpentry at [$62] with [40]% markup. Apply our [Utah] tax.
See How do I have my AI add a change order?.
Note: Your AI works while the estimate is a Draft; you publish, send and record approval in Projul. See Can my AI publish or send an estimate?. It can also write the introduction and contract text; see How do I have my AI write the introduction and contract text?. Use your own unit labels, check derived footage, and note it cannot place the factory order, only create the reminder task.
See also How do I have my AI build an estimate from scratch? and How do I have my AI schedule window and door replacement crews and jobs?.