Describe the lot or driveway the way you would call it in to your estimator, and your AI builds the estimate in Projul: a section for each phase, priced line items, sales tax, and any options the client chooses between. It lands in "Estimates" as a Draft, totals already calculated.
Give your AI the takeoff
The job needs a project or lead first; your AI can create one in the same request. See How do I have my AI add a new lead?. Then walk through the phases the way you would price them out loud: quantity, unit, cost and markup on each line.
Build an estimate in Projul for [Ridgeline Plaza Lot Repave]. Five sections: mobilization and traffic control, milling and removal, base repair and grading, asphalt paving, and striping and markings. [Mill 2 inch asphalt surface, 4,200 SY at $1.85 plus 20%], [3/4 inch aggregate base course, 210 tons at $28 plus 20%], [hot mix surface course, 465 tons at $96 plus 18%], [restripe standard stalls, 148 stalls at $9.50 plus 25%]. Apply our [Utah] sales tax.
Quoting the same scope often? Have it copy a saved template and adjust quantities instead. See How do I have my AI create an estimate from one of my templates?.
Units (SY, SF, LF, ton, gallon, stall, each, hour, day) and markup (percent or flat per unit) land on the line as given; tax applies only where you name a rate, so labor and material can differ. See How does my AI calculate prices, markup and tax?.
Options, change orders and what the client sees
An option, a dumpster pad or a sealcoat package, becomes a selection where only the chosen item counts; a phase can be an assembly so the client sees a quantity against it. See How do I use subsections, selections and display-only sections with my AI?. Your AI can also write the intro and contract text, where conditions on base, weather and lot access live. See How do I have my AI write the introduction and contract text?.
The change order you write most often: the mill exposes more failed base than the bid covered.
Add a change order to the [Ridgeline Plaza Lot Repave] estimate in Projul called [Additional full-depth repair]. One section: [undercut and remove failed base, 620 SY at $6.75 plus 20%], [import and compact 3/4 inch road base, 260 tons at $28 plus 20%], [additional binder course, 74 tons at $92 plus 18%]. Apply our [Utah] tax.
Dropped scope comes off as a display-only deduction on the same order. See How do I have my AI add a change order?.
What you will see
Your AI asks you to approve each step, then reports the estimate number and total. Click "Estimates" and the new one sits at the top as a Draft, phases and subtotals on the card.
Note: Your AI leaves the estimate as a Draft. Reviewing, publishing and sending happen in Projul. See Can my AI publish or send an estimate?.