Click on the "See Schedule" button below the Employee's name from the People page or filter by the employee from the Schedule.
Select "See Schedule" from a user on the People page
- Navigate to the People page from the left sidebar
- Open the dropdown menu of the desired employee
- Select "See Schedule"
This will automatically go to the Schedule page, filtering to show only the schedule of the selected employee. Switch the view to day, month, or calendar; the filter will still apply to that employee.
Apply a filter manually within the Schedule Page
- Navigate to the Schedule page from the sidebar
- At the top right, open the filter
- Select "employees" on the left side of the dropdown menu
- Click on the name of the desired employee.*
*Scroll to see more users, or use the search bar to narrow results.
The schedule will now be filtered to that employee.
Questions? Let's Chat.
support@projul.com
(844) 776-5853